We are continuing to invest in the Amerang site: in summer 2019 the go-ahead was given for work to commence on the construction of a third production hall at our approx. 50,000 m2 premises. From an architectural point of view, it will be designed and constructed in the same way as the other two existing production halls and will also boast approx. 3,000 m2 of floorspace. A total of 14 injection moulding machines were ordered in June 2019, six of which will be added to the fleet in production hall 2. The remaining eight machines will be put to work in the new production hall 3 as from February 2020. Two of the new injection moulding machines have a clamping force of 45,000 kN, which is equivalent to a pressure of 4,500 tonnes. The largest injection moulding machine measures 24 m x 5 m x 4 m and therefore occupies almost the entire width of the hall. Machines of this magnitude will enable us to also manufacture large products, such as our large load carriers and pallets, on site at our technology park for the first time ever. The hall is scheduled to be completed in December 2019.
July 2019 Images »